The operations of every organization are subject to risk, which is the uncertainty that may affect the operations or objectives of the organization. It is therefore necessary to manage these risks systematically by identifying the risk factors that affect the operations or objectives of the organization, analyzing the risks from the opportunities and impacts that occur, prioritizing the risks, defining risk management approaches, and considering the cost-effectiveness of appropriate risk management.


The company is committed to good corporate governance and has established a risk management policy to control risks to an acceptable level. The company has adopted the Enterprise Risk Management (ERM) framework based on the guidelines of the Committee of Sponsoring Organization of the Treadway Commission (COSO), which is an internationally recognized risk management standard, as a guideline for risk management. The Board of Directors, management, and employees at all levels must apply it appropriately and be aware of their responsibilities to comply with the risk management policy to ensure the success and effectiveness of risk management.


Risk Management

The company recognizes the importance of enterprise risk management, which will enable the company to achieve its objectives and goals, with good corporate governance, as well as stable and sustainable growth. The company has therefore established a risk management policy to serve as a guideline and framework for all departments of the company as follows:

(1) The risk management plan is part of the strategic plan, which sets out the operational guidelines and decision-making processes for the company's key activities.

(2) The Risk Management Committee must establish a framework and guidelines for risk management to meet international standards.

(3) Risk management is considered an essential activity of all departments and must be adhered to.

(4) In response to risk management measures, the company is ready to support all departments in mobilizing their resources

to implement the risk management plan.


Roles, Responsibilities, and Accountability in Risk Management

Risk management is the responsibility of all personnel at all levels of the company, including those who perform duties, consultants, agents, or those assigned to act on behalf of the company. The roles and responsibilities of the Board of Directors, Audit Committee, Risk Management Committee, Risk Management Working Group, senior management, supervisors and employees, internal auditors, and related persons as specified in the risk management policy are also included.


Risk Management Process

The company conducts risk management in accordance with the standards and eight components set by COSO, which covers risk management guidelines. The company has established a risk management process consisting of 5 steps as follows:

(1) Objective Setting: In the performance of all departments, including the operators, business objectives or work objectives should be clearly defined and consistent with policies, goals, strategies, and acceptable risks.

(2) Event Identification: The responsible departments, including the operators, should understand the risks, risk factors, and identify potential events that may occur, which may be both positive and negative to the achievement of objectives.

(3) Risk Assessment: The responsible departments, including the operators, should assess the risk in two dimensions: the likelihood of an event occurring and the impact of the event.

(4) Risk Response

The responsible departments, including the operators, should consider effective and efficient risk management methods, taking into account acceptable risks, costs incurred, and benefits to be received. Risk response may choose one or more methods to reduce the likelihood of an event occurring and the severity of the impact of the event, such as:

1. Avoid

2. Share/Transfer

3. Reduce

4. Risk Acceptance

5. Control Activities

The responsible departments, including the operators, should consider risk management or control activities, which are the policies and operational processes used to ensure that the company has managed risks according to the company's internal environment, business nature, organizational structure, and culture, which may vary.

(5) Monitoring

The responsible departments, including the operators, should monitor and review the results of risk management and report to their supervisors to ensure that risk management is appropriately applied at all levels of the company and that risks that have a significant impact on the achievement of the company's objectives are reported to the responsible persons.


Monitoring and Evaluation of Risk Management

The company has established a risk management plan, including a business continuity plan (BCP), and reviews and/or tests the plan annually. This is because when the environment changes, the defined risk management methods may not be appropriate, control activities may be less effective, or operational objectives may change. Therefore, it is necessary to monitor whether risk management at each stage is still effective. The organization will use the principle of self-assessment in its monitoring. The main department responsible for managing any risk will be responsible for assessing the effectiveness of its own risk management and reporting to the Risk Management Working Group, the Risk Management Committee, and the Board of Directors.


In addition, the company also prepares a risk and opportunity assessment register according to other standard systems and/or a corruption risk register. These risk registers are considered part of the risk management plan, and the risks must be monitored and assessed.

Risks to the Company's Business Operations

Risk Register

Risk NameRisk CharacteristicsConsequencesManagement MeasuresRelated Risk Factors
Economic and urban sprawl risks

The current volatile economic conditions and uncertain political policies in the country may impact national development administration and investment, especially as government budget disbursement remains slow.

If the economic or political policies in the country are volatile, it may affect the country's infrastructure and public utility investment plans to be lower, resulting in the company may have a lower construction backlog due to lower government bidding projects, which makes the private sector have higher competition in bidding. In addition, the government's policy to adjust the minimum wage will impact the company's costs to be adjusted higher.

The company attempts to mitigate the volatility from potential risks arising from such situations by implementing a policy to determine the appropriate and sufficient volume of construction work (backlog) to recognize revenue each year. In addition, the company has several measures to reduce the impact of rising labor costs, such as managing construction work to increase labor efficiency by using tools and machinery to replace labor or upgrading labor skills, and strictly controlling expenses.

728 · Description: Volatility in the industry in which the company operates · Info category: STRATEGIC_RISK · 730 · Description: Government policy · Info category: STRATEGIC_RISK · 1715 · Description: Economic risk · Info category: STRATEGIC_RISK
Risks from Fluctuations in Construction Material Prices

As the construction service contract will specify the contract value or service fee from the date of bidding and contract signing, the company must control and manage such costs to be within the specified cost estimates. The costs of construction projects mainly consist of construction materials such as rebar, steel sections, and cement, accounting for 20.00 – 30.00 percent of the total cost.

Most construction projects have a duration of 1-3 years, therefore, the price of construction materials may change from the initial estimate during construction due to fluctuations in global material prices. If material prices increase, it will result in higher construction costs for each project, directly impacting the company's operations. Therefore, the company may be at risk from fluctuations in construction material prices.

The Company acknowledges this risk and has implemented risk management measures starting from the pre-bidding stage. This includes studying the bill of quantities, inspecting the construction site, inquiring about and forecasting the price trends of construction materials and equipment, and planning and determining appropriate construction techniques in accordance with the bill of quantities, construction site, and contract period. These measures are taken to prepare for quantity surveying, cost estimation, and determination of operating expenses, resulting in the most reasonable construction cost estimation at that time. During construction, the Company continuously monitors the prices of construction materials. If prices are likely to rise, the Company will consider pre-ordering or negotiating fixed prices with suppliers to control potential cost fluctuations within an acceptable range, based solely on the quantity required by the Company according to the construction plan. These materials will be stored at the Company's steel storage facility located in Buddhamonthon Sai 7, Sam Phran District, Nakhon Pathom Province, which has a storage capacity of over 5,000 tons of steel. For subcontracting work or specialized contractors, the Company will negotiate and execute contracts to fix the contract price for that specific period. These subcontractors are required to provide performance bonds as a guarantee for fulfilling their contractual obligations. Additionally, for government clients, the contract will include price adjustment clauses based on the K Factor formula. This index measures changes in construction material prices, referencing the construction material price index from the Ministry of Commerce. The K Factor calculation principle involves comparing the initial construction material index from the month of bid opening with the index from the month of work submission. If the difference exceeds 4%, a K Factor compensation can be claimed to adjust the project contract value in case of significant increases in construction material costs.

728 · Description: Volatility in the industry in which the company operates · Info category: STRATEGIC_RISK · 740 · Description: Shortage or fluctuation in pricing of raw materials or productive resources · Info category: OPERATIONAL_RISK · 733 · Description: Business operations of partners in the supply chain · Info category: STRATEGIC_RISK
Risk of cost estimation inaccuracy

In deciding to participate in bidding or agreeing to provide construction services, the company will study and analyze various risks of the project. The company will also prepare drawings and cost estimates for the project, which consist of (1) Quantity and (2) estimated Price, to consider the expected profit margin before bidding. After the cost estimation is completed, it will be presented to the management for consideration in participating in the bidding.

Estimated costs and actual costs incurred during construction are likely to differ. This can be attributed to discrepancies in estimated and actual material quantities, adjustments to construction techniques and procedures, changes in work orders from clients, fluctuations in construction material prices, or unforeseen circumstances. These factors may lead to project outcomes that deviate from the company's expectations. Consequently, the company faces risks associated with cost estimation errors. Overestimations can result in higher bids compared to competitors, potentially leading to missed opportunities. Conversely, underestimations can negatively impact project performance, potentially resulting in financial losses for the specific project.

The Company recognizes the importance of cost estimation, starting from the construction cost estimation process for considering bids or agreeing to provide construction services. The Company has established a cost estimation manual to be used as a systematic guideline and has implemented BIM (Building Information Modeling) technology to support construction drawing extraction for more accurate quantity surveying. The Company has also established a cost estimate review policy as a guideline for reviewing and updating cost estimates during construction. During construction, there may be changes in work from the employer that affect the projected cost estimates. The Company will consider the reasonableness and reliability of the information received from the employer's representatives and will follow up on the details of the increased/decreased scope of work until sufficient information is received before adjusting the cost estimate. If such costs are related to subcontractors, the Company will negotiate an increase or decrease in the contract value and make a written record attached to the contract with the subcontractor. The Company has also established a cost estimate review (Review) process, which includes incurred and unearned costs, at the project cost review meeting every month. The meeting is attended by relevant departments to discuss and review the cost estimates of each project, identify the causes of cost estimate changes, and consider the appropriateness of the forecasts for various projects. If there are changes in prices or quantities of construction work, a cost estimate revision (Revise) will be required to effectively manage costs and expected gross profits in a timely manner. In addition, the Company has established a policy for considering the difference between the accounting progress rate (% Accounting) and the engineering progress rate (% Engineering) by setting an acceptable variance. If the difference between the accounting progress rate (% Accounting) and the engineering progress rate (% Engineering) exceeds the acceptable variance, the Company will identify the causes of the difference. This serves as a guideline for considering the appropriateness of cost estimates to align with the actual work performed, thereby mitigating the risk of cost estimate errors that may affect future operating results.

737 · Other name: Strategic and Operational Risks · Description: Other · Info category: STRATEGIC_RISK
Climate change risks

Climate change is a global issue that organizations are increasingly focusing on. It is a critical issue that has a wide-ranging impact on business operations and human well-being. Governments are issuing more regulations to control operations if there is a lack of management.

Climate change, which has a significant impact on business operations and may cause disruptions to critical processes, poses a challenge to achieving sustainable business goals.

The company has prepared a Business Continuity Plan (BCP), implemented a sustainable development framework (ESG), and prepared greenhouse gas emission reports for the head office and the Buddhamonthon Sai 7 factory to acknowledge the organization's greenhouse gas emissions. This is to explore ways to further reduce greenhouse gas emissions, including implementing projects to utilize solar energy as an alternative energy source, tree planting, and the use of low-carbon construction materials. This also includes plans to obtain ISO 14001 Environmental Management System certification.

1717 · Description: ESG risk · Info category: STRATEGIC_RISK · 1719 · Description: Climate change and disasters · Info category: STRATEGIC_RISK
Risk of labor shortage

The construction business relies on the knowledge, expertise, and experience of its personnel, from the executive level to engineers and specialists in various fields. Personnel are considered the main factor in the company's success. Therefore, the company's competitiveness depends on these personnel who work with the company, which puts the company at risk of relying on capable executives and employees.

If the Company is unable to retain its executives and/or engineering staff and/or any specialists, and is unable to recruit suitable replacements with comparable qualifications, it may affect ongoing projects and competitiveness. This could impact the Company's operations and business opportunities. As of December 31, 2024, the Company has 98 licensed engineers and 12 architects.

The Company recognizes the risk of personnel shortage and has developed human resource management, starting from a good recruitment system to obtain qualified personnel. The Company has a fair salary and compensation system based on ability and work performance to motivate employees. In addition, the Company promotes the development of employees' knowledge and abilities by organizing training courses suitable for the Company's personnel. Moreover, the Company provides opportunities for competent personnel to be promoted to senior management positions to promote career advancement. The Company has a succession plan policy in place for positions at the managing director level and other executive levels. When a position becomes vacant or the incumbent is unable to perform their duties, the Company will nominate a selected and assessed successor to perform the duties or hold the vacant position. Considering the turnover rate of licensed engineers and architects, who are crucial personnel, the rates for 2022–2024 were 17.07%, 17.53%, and 14.48%, respectively. However, the Company has recruited additional personnel in this group to replace those who have left, with 28, 33, and 27 new personnel recruited in 2022–2024, respectively.

738 · Description: Reliance on employees in key positions · Info category: OPERATIONAL_RISK · 739 · Description: Shortage or reliance on skilled workers · Info category: OPERATIONAL_RISK
Risks of subcontracting

As construction work requires specific expertise, especially in the installation of systems and equipment in each project, such as earthwork, pile driving, and elevator installation, and the large number of workers required, the company subcontracts to meet the needs of the client and to be able to deliver the work as specified in the contract.

Hiring subcontractors may lead to errors due to their negligence or breach of contract, which could damage the project's construction plan, potentially causing delays or slowdowns that affect the company's operations.

The Company mitigates such risks by requiring an assessment of subcontractors, considering preliminary information such as registered capital and the maximum value of work previously undertaken. For work requiring specialized subcontractors, such as building construction, electrical and communications work, and machinery partnerships, additional job-specific qualifications, such as technical expertise and personnel capabilities, will be considered to ensure their competence and quality of work as specified by the employer to reduce the likelihood of damage, errors, or breaches of contract by subcontractors. Subsequently, these subcontractors are registered on the Approved Vendor List. The Approved Vendor List is reviewed and evaluated every 6 months, taking into account the quality of work and supervision, understanding of scope and coordination, work control and safety, and trustworthiness. Additionally, subcontracting agreements stipulate a security deposit of 5.00% to 10.00% of the subcontracted amount. If the subcontractor fails to comply with the contract, both during the construction period and the warranty period, the Company may seize the security deposit as agreed upon in the contract. In the past, the Company has encountered situations where its subcontractors did not perform as agreed. The Company enforced the terms of the contract by notifying the subcontractor in writing of their non-compliance and informing them of the seizure of the security deposit. The Company then proceeded to procure new subcontractors to provide services concurrently. The Company has never experienced problems with such subcontractors that would result in project construction plans being halted or delayed, thereby impacting the Company's operations.

739 · Description: Shortage or reliance on skilled workers · Info category: OPERATIONAL_RISK
Project delivery delay risks

In the construction contracting business, the company is responsible for carrying out construction according to the needs and specifications of the employer in each project. The company must deliver the work within the timeframe stipulated in the contract. However, during construction, the company may encounter external factors that could impact the Main Progress Schedule (MPS) and cause delays. These external factors beyond the company's control include: (1) Delays in site handover from the employer, (2) Changes in work scope (additions/reductions) by the employer, (3) Changes in laws and government policies related to business operations, and (4) Impacts from unforeseen events such as epidemics, emerging diseases, natural disasters, as well as delays in work delivery due to substandard work that does not meet the specified standards. Therefore, the company may face risks in delivering the project as per the contractual agreement.

In the event that the company is unable to deliver the work as agreed, it will affect the company's resource management and liquidity. In addition, the company may be subject to penalties incurred from late delivery.

The Company has established operational procedures prior to accepting any project. This involves thoroughly studying and understanding the project's nature, construction drawings, and draft contractor agreements. A risk analysis specific to each project, focusing on potential impacts on the construction timeline, is conducted to facilitate appropriate decision-making regarding project acceptance. Furthermore, during the construction phase, the Company mandates that the Project Quality Management Division prepares weekly and monthly construction progress reports for all projects. These reports are used to monitor the construction status against the contracted schedule, identify issues requiring resolution, and are regularly presented to the Company's management. In the event that a project experiences delays or encounters situations that could potentially impact the delivery timeline, the Project Quality Management Division is responsible for promptly notifying the project owner and manager. Subsequently, discussions are held with the contractor and project consultants to analyze the causes and determine appropriate actions to address deviations from the planned schedule. This may include issuing a written notice to the project owner to request a contract extension, clearly outlining the reasons for the delay. To date, the Company has never incurred penalties for late project deliveries.

741 · Description: Systems or internal control system · Info category: OPERATIONAL_RISK · 746 · Description: Delays in the development of future projects · Info category: OPERATIONAL_RISK
Risks of Errors in Construction Procurement

During construction, accidents or errors in the company's operations can always occur, affecting construction workers, construction equipment and materials, and third parties, including damage to property during construction. Furthermore, after project delivery, the company is obligated to provide a warranty period of 1-2 years, during which the company is responsible for repairs and liable for claims arising from construction defects.

Therefore, the company is at risk of accidents or errors that may affect the company, whether in terms of image, lawsuits, legal proceedings, and potentially increased expenses.

To ensure construction efficiency and minimize errors arising from construction contracting, the Company requires construction units to adopt the quality policy in accordance with the ISO 9001 standard as the main principle of operation. This includes a plan to implement the ISO 14001 Environmental Management System and the ISO 45001 Occupational Health and Safety Management System by 2025. The Company also strictly complies with the standards for safety, occupational health, and environmental management in construction work by appointing both safety officers and a safety, occupational health, and working environment committee for each construction unit to manage potential safety risks. This includes providing personal protective equipment for workers to wear during construction work to reduce accidents. In addition, the Company selects and appoints project managers, project engineers, work supervisors, and selects personnel within the project who have experience and ability to perform the work. The Company also provides regular training to personnel in both engineering and safety. Furthermore, the Company provides all risks insurance for construction contractors (CAR: Contractor All Risks Insurance) for each project, which covers liability under the construction contract, such as construction work, civil engineering work, and machinery installation. It also covers liability under the law of contract work that may arise to external parties.

741 · Description: Systems or internal control system · Info category: OPERATIONAL_RISK · 746 · Description: Delays in the development of future projects · Info category: OPERATIONAL_RISK · 736 · Description: Damage to company image and reputation · Info category: STRATEGIC_RISK · 749 · Description: Safety, occupational health, and working environment · Info category: OPERATIONAL_RISK
Income inequality risk

The Company's revenue recognition primarily falls within the period from construction to project delivery as per the contract. Therefore, to maintain or increase the Company's revenue level consistently, the Company must continuously participate in bids or submit proposals to secure new projects.

The continuity in participating in bids or proposals depends on the number of projects open for bidding or proposals by the employers. There may be external factors affecting the expansion of projects or new investments by both public and private employers, such as economic conditions, politics, plans, and readiness for investment in projects by the public and private sectors. In the past year 2024, Thailand has experienced an economic slowdown due to decreased consumption and government investment, coupled with a contraction in private investment. Additionally, there is increased competition in the construction industry due to a large number of contractors. These factors may result in a lack of projects open for bidding or proposals, as well as an increase in the number of bidders or proposers, providing more options for employers. This could lead to the company not being awarded the planned number of projects and facing the risk of inconsistent revenue year-on-year.

The Company acknowledges the risk of potential revenue fluctuations stemming from delays in public and private sector project expansions or investments, as well as from the aforementioned increase in industry competitors. Consequently, the Company has tasked its bidding department with consistently monitoring bid announcements and tenders. This monitoring occurs through primary channels such as the Electronic Government Procurement system (e-GP), procurement sections on state enterprise and private sector websites, and recommendations from design consultants or construction supervisors.

1725 · Description: Income volatility · Info category: FINANCIAL_RISK
Risk of late payment and default by the charterer

In order to collect payments from the employer, the company must complete the construction work according to the employer's specifications for each installment specified in the contract and must pass the employer's inspection and acceptance process before being able to collect payments from the employer. Therefore, during the construction period, the company will have to bear the various construction costs, including labor and construction material costs, which result in the company's risk of late payments and defaults by the employer in the event that the employer has financial problems and is unable to make payments according to the terms of the contract.

Delayed payments and defaults by employers may adversely affect the Company's working capital liquidity and short-term and long-term operating results. In the past, the Company had two projects where employers defaulted on service payments, which occurred since 2014.

The Company prioritizes the job acceptance process by analyzing the history, financial status, credibility, and business nature of the employer before considering accepting any job. This includes specifying the terms of advance payment from the employer before commencing work under the contract. Moreover, during the construction phase, the Company requires the accounting and finance department to consistently monitor the payment of service fees for each installment according to the timeframe stipulated in the contract. In the event that the employer fails to make payment beyond the specified period, the accounting and finance department will proceed to notify the Company's executives and project managers to assist in following up with the employer. Currently, the Company does not have any employers with outstanding service fees or risks associated with late payments and defaults from employers.

763 · Description: Default on payment or exchange of goods · Info category: FINANCIAL_RISK
Risk of unbillable accounts receivable

Unbilled revenue arises from the Company completing construction before the billing cycle. This results in the Company recognizing revenue from construction work already performed but not yet being able to issue invoices for payment, which is normal in the construction contracting business.

If the Company proceeds with construction significantly ahead of the scheduled payment plan, the Company may incur construction costs arising from construction materials, labor costs, and subcontractor fees, including delays in billing and uncollected revenue resulting from late work inspections or amendments to contract attachments, which may affect the Company's working capital and liquidity.

The company has appropriate construction planning, which is in accordance with the contract period specified by the employer. In addition, the company has assigned the legal department to follow up on the amendment of the contract appendix and the employer's inspection and acceptance plan to enable the company to invoice outstanding receivables. Furthermore, the company has a policy of hiring subcontractors on a back-to-back basis, whereby payment will be made to subcontractors upon receipt of payment from the employer. This can reduce the risk of bearing construction costs if the company is unable to invoice and collect payment. Currently, the company does not have any liquidity risk.

767 · Other name: Financial Risk · Description: Other · Info category: FINANCIAL_RISK
Risks from regulatory changes, regulations, and laws

In undertaking construction contracting business, the Company must comply with regulations, rules, and laws in accordance with ministerial regulations and notifications stipulated by relevant government and private agencies. In particular, personnel responsible for construction or supporting construction must hold licenses to practice relevant professions, such as a Professional Engineering License and an Architectural License, among others, including other licenses related to work safety procedures. Furthermore, the Company is obligated to comply with the law, including any other provisions of local ordinances as determined by each locality. These personnel licenses have a specified duration and require periodic renewal. There may also be amendments to laws and/or regulations related to such licenses that may require the Company to take further actions.

The Company therefore cannot guarantee that the Company will be granted a renewal or that there will be no delays in renewal, and cannot guarantee that the Company will be able to comply with any new laws or regulations promptly, which may affect the Company's business operations and future performance.

The Company has established controls and oversight to ensure that its operations comply with the regulations of the Ministry and relevant agencies, as well as any other laws related to the Company's business operations. The Company will renew its licenses upon their expiration and will notify personnel responsible for critical functions to renew their professional licenses periodically. In addition, the Company requires the legal department to monitor changes in laws and regulations that affect the Company's business, labor protection, various rules and regulations, including newly issued regulations, to enable the Company to plan its business operations and contingency plans in a timely manner. This ensures that the business can continue without interruption.

756 · Description: Change in laws and regulations · Info category: COMPLIANCE_RISK · 757 · Description: Laws and regulations is not favorable for doing business · Info category: COMPLIANCE_RISK · 758 · Description: Violations of laws and regulations · Info category: COMPLIANCE_RISK

Risks to Securities Holders' Investment

Risk Register

Risk NameRisk CharacteristicsConsequencesManagement MeasuresRelated Risk Factors
Risks from Key Supplier Dependency

The Company has been operating in the construction business for over 40 years, with continuous growth under the management of the Rochejchanya family, which has passed down the business from generation to generation. Currently, the main management team consists of Mr. Saran Rochejchanya, General Manager, Mr. Thiti Rochejchanya, Senior Executive Vice President - Business Support, and Mr. Chanin Rochejchanya, Assistant Managing Director - Administration, who play a key role in setting policies, directions, and operating the Company's core businesses.

Reliance on key executives may impact business management if such executives are unable to perform or manage their duties in the future. This reliance may also affect the perception of management effectiveness.

The Company recognizes such risk and has implemented a decentralized management structure. The Company has a Board of Directors, Executive Directors, and management officers with experience and expertise in various fields to jointly oversee different departments, thereby reducing reliance on a single executive. In addition, the Company has established a succession plan policy to ensure that it has qualified and capable personnel who are ready to assume key positions within the organization, enabling the Company to operate and expand its business sustainably when such positions become vacant.

769 · Other name: Risks from Key Supplier Dependency · Description: Other · Info category: HOLDER_RISK
Shareholder Investment Risk

The fact that the company has major shareholders, as of May 8, 2023, the company's major shareholder group is the "Rodlerdjanrja" group (this is only a preliminary grouping based on last names and relationships of father, mother, children, and spouses of children), holding a combined 78.54 percent of the registered paid-up capital. This represents a significant shareholding, which has the potential to influence the direction of management policies, including the ability to control shareholder meeting resolutions that require a majority vote, such as the appointment of directors or resolutions on other matters that require a majority vote of the shareholders' meeting.

Other shareholders may be at risk and affected by the fact that the Rochdale Group can exercise the right to object to or disapprove of resolutions at the shareholders' meeting in matters that require a vote of not less than 3 out of 4 of the total votes of the shareholders attending the meeting and entitled to vote, such as the company's Memorandum and Articles of Association, etc. Or there may be a risk that it will not be possible to gather dissenting votes to check and balance matters proposed by major shareholders.

The Company recognizes the importance of checks and balances and has clearly and transparently defined the scope of authority, duties, and responsibilities of various board committees to ensure shareholder confidence. The Company will disclose information and comply with the relevant rules and regulations of the SEC and the Stock Exchange of Thailand to enable shareholders to be informed of material business operations or to consider securities investment.

769 · Other name: Shareholder Investment Risk · Description: Other · Info category: HOLDER_RISK