NL Development Public Company LimitedSET: NL🇹🇭 TH

Business Operation · 2024

Corporate Information

Company Name

NL Development Public Company Limited

Telephone

0-2435-1054

Website

www.nldplc.com

Email

info@nldplc.com,ir@nldplc.com

Dividend Policy

Dividend Policy

The Company has a dividend payment policy of not less than 50 percent of the Company's net profit from separate financial statements after deducting corporate income tax and all types of reserves as stipulated in the Company's regulations and requirements.


However, such dividend payment may be subject to change depending on the Company's and its subsidiaries' operating results, financial liquidity, cash flow, the need for working capital to manage the business, and future expansion plans as deemed appropriate by the Board of Directors. The annual dividend payment must be approved by the shareholders' meeting, except for interim dividend payments, which the Board of Directors may approve from time to time when it deems that the Company has sufficient profits to do so and will not affect the Company's operations. The Board of Directors shall report such interim dividend payments to the shareholders' meeting at the next meeting.

Historical Dividend Payments

This YearLast Year2 Years Ago3 Years Ago4 Years AgoMetricDescriptionRemark
0.020.340.860.820.74Net profit per share (Baht : Share)Net profit per share (baht : share)
0.040.150.50.50.4Dividend per share (Baht : Share)Dividend per share (baht : share)
Dividend payment rate of 0.0400 Baht per share, subject to the approval at the 2025 Annual General Meeting of Shareholders.
00000Dividend stock ratio (Number of original shares: dividend shares)Ratio of stock dividend payment (existing share : stock dividend)
00000Dividend share value per share (Baht : Share)Value of stock dividend per share (baht : share)
0.040.150.50.50.4Total dividend payment value (Baht : Share)Total dividend payment (baht : share)
Dividends paid are paid from the operating results for the year only.
220.0266.9260.856,10455.02Dividend payout ratio to net profit (%)Dividend payout ratio compared to net profit (%)

Major Shareholders

Major Shareholders

No.NameShares% Shares
10,346RL JANYA GROUP INTERNATIONAL COMPANY LIMITED150,000,00030
10,347MR. SARUN ROJLERTJANYA66,661,49513.33
10,348MR. POOMSON ROJLERTJANYA45,197,2809.04
10,349MR. CHANIN ROJLERTJANYA33,058,5956.61
10,350MR. KOSOL ROJLERTJANYA14,982,4303
10,351MR. SOMPONG SILSOMBOON12,200,0002.44
10,352MRS. DUANGTA ROJLERTJANYA11,807,9052.36
10,353MR. THITI ROJLERTJANYA10,792,0802.16
10,354MR. PITI ROJLERTJANYA8,952,8801.79
10,355MR. NITHI ROJLERTJANYA8,952,8801.79
10,356MRS. PIYARAT ROJLERTJANYA6,415,8201.28
10,357MR. UDOM JATURAPAKUN5,950,0001.19
10,358MR. SOMKUAN PRIYAWAT5,344,0001.07
10,359MISS CHOTANA ROJLERTJANYA4,737,1200.95
10,360MISS SUCHANA ROJLERTJANYA4,737,1200.95
10,361MR. PISIT PATANAPONGSAKORN2,900,0000.58

Remark

List of Shareholders Holding More Than 0.5% of Shares Company Information as of the Registered Closing Date on May 8, 2024

Business Strategies Overview

Chairman's Message

In February 2024, NL Development Public Company Limited became a listed company on the Stock Exchange of Thailand (SET) and offered an initial public offering (IPO) of 130 million shares to raise funds. These funds will be used to purchase new construction tools and equipment for use in ongoing construction projects and future new construction projects, as well as for working capital. The company operates a comprehensive construction business (One-Stop Service), accepting work from government agencies, state enterprises, and other government units, as well as private entities, acting as the main contractor for projects.

Throughout 2024, competition in the construction industry remained intense. Construction contractors, especially those primarily undertaking government projects, faced challenges from delays in new project bidding and delays in the annual budget approval process, as well as rising construction costs.

The Board of Directors has established guidelines for operations, including bidding for projects, requiring the company to carefully and thoroughly consider risks in various aspects. This includes considering good corporate governance under the framework of laws, business ethics, and regulations. The company has established a system of standards, including important policies such as the Anti-Corruption and Anti-Bribery Policy, the Corporate Social Responsibility Policy, and the Environmental and Stakeholder Policy for organizational sustainability. The Board has also assigned the management to adjust operations to be in line with and able to cope with intense situations, especially cost management, which is a crucial factor in the construction business. This ensures that operations achieve their goals effectively, along with promoting sustainable organizational development under the ESG framework. The company places importance on these efforts and has been honored with the ESG DNA certificate from the Stock Exchange of Thailand for the first year, with plans for continuous implementation to meet the needs and expectations of stakeholders in all sectors.

In 2025, the company plans to obtain certification for the Environmental Management System (ISO 14001) and the Occupational Health and Safety Management System (ISO 45001). We are also committed to seeking certification from the Collective Action Coalition Against Corruption (CAC) to emphasize the importance of good corporate governance, sustainable development, and enhanced competitiveness. We strive to build a strong and sustainable organization, aiming to become a leading professional construction company.

On behalf of the Board of Directors, we would like to thank all executives and employees for their unwavering commitment to development, dedication to goals, anticipation through preparation, and logical thinking. These actions embody the company's shared values (DEAL), driving the company towards success in achieving its business objectives. We would also like to express our gratitude to all shareholders, customers, partners, business alliances, and supporters for their trust in the company's operations. We sincerely hope to continue receiving your trust and goodwill as we work together to lead the company towards sustainable growth.


Vision

We are committed to building a strong and sustainable organization to become a leading professional construction company.

Objectives

Due to the slower-than-expected recovery of the Thai economy and tourism industry, private sector investment in new construction projects has been delayed, resulting in intensified competition for both public and private construction projects.

However, NL still has strengths, both in terms of our portfolio and experience that have earned the trust of our clients, especially in complex building projects. We also have a strong management system, team, and financial resources. These factors give us a good competitive advantage, and we remain committed to

complexity, as well as the readiness of our management system, team, and strong financial resources. This allows the company to still have good opportunities in competition and remain committed to

To expand our business amidst the current situation, we will work together to achieve our goals, collaborate to deliver tangible results, prioritize good governance, operate within a sustainable development framework, enhance our competitiveness, and strive to build a strong organization.

and grow sustainably to become a leading professional construction entrepreneur.

Goals

The company sets goals and missions as follows:

1. Continuously develop the MPS plan to be comprehensive in every step, measurable, and integrated with other plans to be consistent with the actual MPS plan, including joint responsibility, driving, and monitoring to ensure compliance with the established plan.

2. Develop speed and efficiency in all departments and at every stage of work, along with prioritizing workplace safety, including developing communication, coordination, and accurate, precise, and timely information exchange.

3. Reduce and avoid expenses and operating costs incurred from errors or work that is behind schedule.

Mission

1. Brainstorm ideas to continuously improve organizational effectiveness.

2. Support creativity, logical analytical thinking processes, and continuously develop personnel capabilities.

3. Explore new knowledge and technologies to develop work systems that keep pace with global trends.

4. Build good relationships with partners and seek alliances to enhance the organization's strength.

5. Deliver high-quality work, on time, and with client satisfaction.

6. Conduct business with safety in mind, with responsibility towards society and stakeholders.

Business Strategies

The company places importance on achieving the set goals and for the business to be successful, the company has developed a strategy.

Conducting business to achieve goals effectively and to enable the company to compete and serve as a guideline for driving the organization.

To have sustainable strength, which can be summarized into 3 main strategies:

(1) Competitive Strategy

(2) Management Strategy

(3) Sustainability Strategy







(1) Competitive Strategy

Job Sourcing Channel Strategy

The company has a market position that allows it to accept work from both the public and private sectors. The company adjusts its work acceptance.

According to market conditions, the economic situation, and business objectives in each period, the company assesses the risks of the project.

To ensure that the work can be delivered according to the quality, accuracy, completeness within the scope of work, and within the specified timeframe. There are channels to monitor the project regularly through the procurement system and the business news center. The private sector has channels to receive work from direct contact from employers, including referrals from consulting firms that supervise the project.

Pricing strategy

The company has a policy of pricing by estimating costs in detail, both direct construction costs.

According to the shop drawing, preliminary work costs, and other environmental factors, using technology that has been developed for use in the construction industry.

Comprehensive or Building Information Modeling (“BIM”) to help make the design faster and more accurate. Then estimate the cost plus the operating profit rate, which has been approved by the Board of Directors and is an appropriate rate, covering operations, and competitive in the market.

Work Delivery Strategy

During construction, the company will use technology, key knowledge, and an experienced team to jointly assess and analyze obstacles in advance to ensure that the company is ready to resolve them if such events occur or to present more appropriate approaches.

To employers, work supervisors, and within the company itself, which will lead to the maximum benefit of the company's stakeholders and maintain good relationships because the company places importance on delivering work to employers that can be used for its intended purpose both in terms of the quality of construction, completeness, accuracy within the scope of work, and the specified timeframe.

(2) Management Strategy

Procurement Strategy

Procurement is important in cost management. Procurement must be cost-effective, including considering the reliability of the supplier/service provider, their work, and working techniques in order to obtain both quality and reasonable prices. Therefore, the company has a process.

In selecting, inspecting, and registering suppliers/service providers, the company will plan the need to use construction materials for all projects that it provides services to.

At the same time, to combine the volume in purchasing large quantities of construction materials (Big Lot Purchase) or negotiating to purchase multiple projects together to increase bargaining power, resulting in lower prices.

Budget Control Strategy

The company has stipulated that a budget for each work item be prepared before procurement in order to be able to reach the initial gross profit rate of each project first. If the price changes significantly in the work items or prices, the company will be able to adjust the budget to reflect the most realistic situation. In addition, the company uses an ERP system to track the cost status of each project quickly and up-to-date, making it known.

Changes in the gross profit margin of such projects are constant.

Management Strategy

The company has an organizational structure in an international format, focusing on professional construction management, planning, and operation with clear policies, procedures, and work systems. It has been certified to the ISO 9001 international quality management system standard and is in the process of applying for ISO 14001 (Environmental Management System) and ISO 45001 (Occupational Health and Safety Management System) certifications. There are also audits from both internal and external organizations, along with expert consultants in key professions who are ready to provide advice.

And there is an independent audit committee to oversee the business to be transparent and auditable.

Contract Management Strategy

The company arranges for the inspection and understanding of all contracts and supporting documents, which the legal department and related departments will summarize and clarify before the project launch (Pre-Kickoff) to ensure that all parties involved understand and can comply.

Accurately, completely, including protecting the rights and interests of the company with maximum efficiency. Moreover, during every step of the construction process.

That may affect the contract, the company will determine the methods and forms of practice that have been verified by the legal department to be cautious in contract administration.

And report the status of each project contract to the Executive Committee on a monthly basis.

Project and Program Service Strategy

The company has adopted technology to enhance accuracy, speed, correctness, and reduce duplication of work, such as Microsoft Project, which is a tool to help the team plan the project schedule. The ERP system is used from start to finish, including the use of BIM in analyzing and planning engineering together with designers, supervisors, and subcontractors to reduce errors and time.

Working to ensure that the company can deliver work according to the plan specified in the contract and prevent incidents that will result in adjustments from the service.

And increased operating costs.

Engineering and Production Support Strategy

The company has established a service center as a place for research, technical experiments, and training for technicians and workers before actual work. There is also a steel cutting and bending factory to reduce material waste and labor. There is also a place to produce furniture.

To respond to customers who want to decorate the interior of the building, including providing a central support unit to support the construction unit in engineering techniques.

And construction procedures for personnel specializing in various fields to analyze, research, define techniques, and work procedures to be appropriate.

Ready to train practitioners and monitor work performance.

Technology Strategy

The company plans and implements BIM (Building Information Model) technology.

Comprehensively, from analyzing the design and meticulously calculating material quantities during the bidding process to planning and preparing for construction. The use of BIM technology enables the company to reduce redundant work. In addition, the company utilizes technologies such as the Bar Cut List program to assess.

The shape, size, and type of rebar are used to support the work in the rebar cutting and bending factory, which can effectively manage the use of rebar to reduce errors and loss of rebar quantity.

Compliance and Safety Strategy

The company places great importance on safety at work and compliance with various rules and regulations.

Strictly, safety regulations have been established, including the procurement and assignment of safety officers at various levels, and the inspection of important licenses to perform duties at construction sites. In addition, safety inspections are carried out on the work of employees and subcontractors, surveying the area to assess potential risks, and providing all types of contractor risk insurance (CAR: Contractor All Risks Insurance), which covers construction work, materials, equipment, and machinery used in construction, and liability to outsiders during the construction period of every project. In addition, we are in the process of applying for ISO 14001 (Environmental Management System) and ISO 45001 (Occupational Health and Safety Management System) certifications to enhance the efficiency and effectiveness of our management system.

(3) Sustainability Strategy

The company is committed to and places importance on participating in sustainable development by conducting business and enhancing the development of personnel and the organization to cover economic, social, and environmental aspects. This is achieved by developing management systems in conjunction with personnel development to meet the diverse needs of each type of customer and enhance the organization's capabilities to prepare for environmental changes, to stay ahead of competitors both now and in the future. It also includes defining the corporate values "DEAL" and the framework for development goals by focusing on the implementation of the United Nations Sustainable Development Goals (SDGs) and the framework for sustainable corporate development (Environment, Social and Governance: ESG).

Material Changes & Developments

Material Changes & Developments

YearDescription
2,024

• Registered as a listed company on the Stock Exchange of Thailand (SET)

• The 2024 Annual General Meeting of Shareholders on April 24, 2024, resolved to approve the payment of dividends to shareholders for

Operating results for the year 2023 amounted to 76.40 million baht

• Received a 3-medal rating in the 2024 Annual General Meeting (AGM) Quality Assessment Project.

of listed companies on the Stock Exchange of Thailand from the Thai Investors Association

• Signed a memorandum of understanding with the Baan Dek Foundation in the Building Social Impact project to enhance management.

Residential camps and the quality of life of employees and children residing with their families

• Received a certificate of honor, ESG DNA project organized by the Stock Exchange of Thailand on September 3, 2024

• Awarded a construction project for the construction of a multi-purpose field, Phramongkutklao Hospital

• Awarded a construction project for the construction of the Cancer and Radiation Therapy Center, Suranaree Subdistrict, Mueang Nakhon Ratchasima District

Nakhon Ratchasima Province

2,023

• The Extraordinary General Meeting of Shareholders No. 1/2566 held on March 31, 2566, resolved to change the par value of the shares to THB 5.00 per share.

THB 1.00 per share and increase the registered capital from THB 370.00 million to THB 500.00 million by issuing 130,000,000 ordinary shares with a par value of THB 1.00 per share, offered to the public for the first time (IPO).

• The Annual General Meeting of Shareholders for the year 2566 held on March 31, 2566, approved the payment of dividends to shareholders for

The operating results for the year 2565 amounted to THB 37.00 million.

• The Board of Directors' Meeting No. 4/2566 held on July 25, 2566, resolved to pay an interim dividend of

to shareholders, totaling THB 115.07 million.

2,022

• The 2022 Annual General Meeting of Shareholders held on 22 April 2022, approved the payment of dividends to shareholders for

the performance of the year 2021 in the amount of 35.00 million baht.

• The Extraordinary General Meeting of Shareholders No. 1/2022 held on 1 August 2022, resolved to increase the registered capital from 350.00 million baht

is 370.00 million baht by issuing 4.00 million ordinary shares at a par value of 5.00 baht per share.

totaling 20.00 million baht to the existing shareholders in proportion to be used as working capital for business operations.

• The Meeting of the Board of Directors No. 5/2022 held on 14 November 2022, approved the payment of interim dividends

to shareholders in the amount of 111.00 million baht.

• Establishment of Parsecon Co., Ltd. (“Subsidiary” or “PSC”) on 22 March 2022, to operate a construction business providing labor services with a paid-up registered capital of 10.00 million baht, in which the Company holds 99.99% of the shares.

Use of Proceeds from Securities Offerings

Introduction

As NL Development Public Company Limited (“the Company”) offered its initial public offering (IPO) of 130,000,000 ordinary shares at a price of 2.60 Baht per share during February 12 – 14, 2024, and received total proceeds from the offering, after deducting offering expenses, of 327.86 million Baht, the Company hereby discloses the utilization of proceeds received from the IPO as of December 31, 2024, as follows:

Is There Money Raised from a Securities Offering Still to Report On?

Yes

Offerings

Type of SecuritiesAmount Raised Given AsAmount Raised (Million Baht)Uses of the MoneyUsed as Declared?
Equity Instruments2873372.862024-12 · Objective: To finance the purchase of new machinery and construction equipment for use in uncompleted construction projects and future construction projects. · Period type: 2870 · Start period: 2024-02 · Spent amount type: 2873 · Start spent amount: 16050000.0 · Expected amount type: 2873 · Start expected amount range: 50000000.0 · 2024-12 · Objective: For use as working capital · Period type: 2870 · Start period: 2024-02 · Spent amount type: 2873 · Start spent amount: 277860000.0 · Expected amount type: 2873 · Start expected amount range: 277860000.0Y

Commitments Made in the Registration Statement

Are There Commitments or Conditions from an Offering or Listing?

No

Group Operating-Structure Policy

Description


As of December 31, 2023, the Company has one subsidiary, Parsecon Company Limited (“Subsidiary” or “PSC”), which provides labor services to support the Company's operations. The Company’s group structure is as follows:






Companies Where the Company Holds ≥10%

Companies (≥10% Holding)

Company NameAddressProvinceZip CodeTelephoneBusiness TypeSecurity TypeSharesPaid-up Shares
Parsecont Co., Ltd.417 Ratchawithi RoadBangkok10700024351054Business providing labor services to support company operationsCommon shares999,9981,000,000

Shareholders with Potential Conflict of Interest

Has Potential-Conflict Shareholder (Y/N)

No

Relationships Among Major Shareholders

Relationship Exists (Y/N)

No

Shareholders' Agreement

Agreement Exists (Y/N)

No

Shareholding Diagram (Group Structure)

Subsidiaries

Company NameJuristic Persons / Holders
PARSECON COMPANY LIMITEDNL Development Public Company Limited · Voting rights percent: 99.99 · Shareholding proportion percent: 99.99

Income Structure

Introduction


Revenue Structure

In 2022 - 2024, the Company's revenue from construction contracts and other income are as follows:

(1) Revenue from construction contracts, which can be classified into 2 categories: revenue from construction contracts by project type and revenue from construction contracts by client type.

(2) Other significant income: such as income from scrap metal sales, contractor's insurance proceeds, and profit from the sale of assets.



Revenue structure from construction contracts by project type

Revenue from construction contracts by project type:

(1) Hospitals: such as hospitals, medical centers, and medical service buildings.

(2) Office and commercial buildings: such as office buildings, educational institutions, and department stores.

(3) Residential buildings: such as condominiums, hotels, apartments, dormitories, and houses.

(4) Special buildings: such as museums, conference halls, libraries, and institutes.

(5) Other construction works: such as factories, warehouses, roads, and drainage canals.

Note: The table shows the combined revenue of special buildings and other construction works.



Revenue structure from construction contracts by client type

Revenue from construction contracts by client type can be classified into 3 categories:

(1) Government agencies: Entities that procure in accordance with the Government Procurement and Supplies Management Act B.E. 2560 (2017) through the Electronic Government Procurement System (e-GP), such as the Medical Department, Ministry of Public Health, Faculty of Medicine, Chulalongkorn University, Suranaree University of Technology.

(2) State enterprises and other state agencies: Entities established by government agencies, which may or may not be part of government agencies and use all or part of the budget allocated from the government. This type of employer may have its own procurement system without relying on the e-GP system, such as King Chulalongkorn Memorial Hospital, The Institute for the Promotion of Teaching Science and Technology (IPST).

(3) Private sector: Entities that procure without using the government budget, such as National ITMX Co., Ltd., Antnest Holdings (Thailand) Co., Ltd., and various foundations.








Product / Service Income

CategoryDescriptionThis YearThis Year %Last YearLast Year %2 Years Ago2 Years Ago %
Total revenue from operationsTotal revenue from operations1,328,267.461002,188,445.71001,239,187.77100
Construction revenue1,293,545.1897.392,176,783.8199.471,218,786.2398.35
OtherOthers34,722.282.6111,661.890.5320,401.541.65

Export Income

CategoryDescriptionThis YearThis Year %Last YearLast Year %2 Years Ago2 Years Ago %
Total revenueTotal revenue1,328,267.461002,188,445.71001,239,187.77100
DomesticDomestic1,328,267.461002,188,445.71001,239,187.77100
InternationalInternational000000

Other Income

Operating Other IncomeNon-Operating Other IncomeShare of Profit
1710 · As of year: 34722.28 · Description: Total other income · As of yesteryear: 11661.89 · As of year before yesteryear: 20401.54 · 1711 · As of year: 34722.28 · Description: Other income from operations · As of yesteryear: 11661.89 · As of year before yesteryear: 20401.541712 · As of year: 0.0 · Description: Other income not from operations · As of yesteryear: 0.0 · As of year before yesteryear: 0.01713 · Description: Share of profit

Product / Service Characteristics

Business Type

3114

Business Groups

Business GroupDescription
Construction

The Company operates a fully integrated, one-stop construction service business (One-Stop Service), undertaking projects from government agencies, state enterprises, other state agencies, and private entities. As the main contractor (Main Contractor), the Company secures projects through bidding or direct negotiation with project owners to ensure efficient construction. The Company mandates its construction units and related departments to implement the ISO 9001 quality management system as the core operational framework to meet client requirements. This emphasizes efficiency, quality, safety, and project completion within the stipulated timeframe and budget. Currently, the Company utilizes Building Information Modeling (BIM) technology in every design stage, enhancing the efficiency of analysis, design control, and construction processes. Additionally, the Company owns a factory located on Phutthamonthon Sai 7 Road, Sam Phran District, Nakhon Pathom Province. This facility comprises a steel cutting and bending plant, which processes steel into desired shapes for construction before delivery to project sites. This aims to manage steel usage efficiently in terms of both time and cost. Currently, the Company employs the Bar Cut List system for accurate steel inventory and usage management. Furthermore, the factory houses a furniture production unit to cater to client needs for interior decoration in various buildings. The Company also possesses a warehouse for steel storage, providing a buffer against potential price fluctuations in raw materials.

Research & Development

Has R&D Policy (Y/N)

No

R&D Cost — Label

Research and development (R&D) expenses over the past 3 years (Million Baht)

Assets Used in the Business

Introduction

Investment

The Company operates a construction business. According to the Company’s financial statements as of December 31, 2017, the Company has investments in 1 subsidiary.

(Details are shown in the attached document 4)

Permanent Assets — Description

As of December 31, 2024, the Company's head office is located in Bangkok, and the main fixed assets are in Nakhon Pathom Province. The main fixed assets used in the Company's business, with a net value of 203.92 million baht, consist of

1. Land, buildings and equipment

As of December 31, 2024, the Company and its subsidiaries had land, buildings and equipment with a net value of 183.54 million baht.

2. Right-of-use assets

As of December 31, 2024, the Company and its subsidiaries had right-of-use assets, consisting of 9 right-of-use assets arising from land lease agreements and 1 right-of-use asset arising from an office building lease agreement, with a total value of 10.88 million baht.

3. Intangible assets, which are computer software, with a net value of 9.50 million baht.

(Details are shown in the attached document 4)

Intangible Assets — Description

As of December 31, 2024, the Company had intangible assets, consisting of computer software

(details of which are shown in Note 4).

Has Subsidiaries Investment Policy (Y/N)

Yes

Subsidiaries Investment Policy — Description

The Company has a policy of investing in companies that have the same business objectives as the Company's business or similar businesses, or businesses that support the Company's business, which will enable the Company to have increased operating results or profits, or invest in businesses that are synergistic to the Company by being able to support the Company's core business to be more comprehensive in order to increase the Company's competitiveness. However, the Board of Directors may consider investing in businesses other than the Company's core business or other businesses if the Board of Directors deems that such businesses have potential and such investment is beneficial to the Company and the shareholders as a whole.

In addition, the Board of Directors will consider sending the Company's representatives who have appropriate qualifications and experience in the businesses the Company invests in to be directors of such subsidiaries and companies. Such representatives may be the Chairman of the Board of Directors, Managing Director, Director, executive, or any person of the Company who is free from conflicts of interest with the businesses of those subsidiaries. This is to enable the Company to control and supervise the business and operations of the subsidiaries as if they were a unit of the Company. The Company therefore requires that the Company's representatives must manage the business of the subsidiaries in the best interests of the Company and ensure compliance with the laws relating to the business operations of such subsidiaries. In addition, the sending of representatives to be directors of such subsidiaries shall be in accordance with the Company's shareholding proportion.

Marketing Policy & Competition

Reporting Mode

3117

Marketing Policy (Overall)

Company's Competitive Policies or Strategies

The Company positions itself in the market to be able to undertake both public and private sector projects, adjusting its proportions based on market conditions, the economic climate, and operational goals for each period. Government projects utilize national budget allocations, have long construction durations, and offer payment certainty. In the market where the Company operates, most projects are large-scale. The Company's accumulated track record enables it to meet the criteria for participating in bids for various types of building projects, with project values ranging from hundreds of millions to several billion baht, catering to contracts from various government agencies. Additionally, the Company has experience in handling public sector projects with unique characteristics, particularly regarding relevant rules, regulations, procedures, and laws. This allows for the assembly of project teams and execution in a compliant and efficient manner.

The private sector market, on the other hand, is characterized by fluctuations influenced by economic changes and exhibits diversity in terms of project types, contract models, and client organizational structures. Most projects demand speed, requiring agility in project management and the ability to adapt to client needs. The advantages of private sector projects lie in their generally shorter durations and faster payment cycles compared to government projects. However, the Company also exercises caution in selecting partners. For most private sector projects, the Company receives inquiries from designers or project supervisors with whom it has collaborated previously, fostering long-standing relationships. The Company's track record of delivering high-quality work that meets client objectives within specified timeframes has earned it recognition. In cases of projects requiring exceptional speed, the Company may be directly invited for negotiations by project owners. The process of participating in bids for government projects begins with studying the bidding announcements. These announcements typically outline requirements related to registered capital, personnel in various fields, and performance certificates with comprehensive scopes. The Company possesses a portfolio that allows it to participate in bids across multiple government sectors for projects worth billions of baht.

Upon entering the bid submission phase, the Bidding section thoroughly examines the TOR and bills of quantities to gain a comprehensive understanding, scrutinizing noteworthy points and seeking clarifications through inquiries. Site visits are conducted to gather firsthand information on surrounding factors. Subsequently, the complexity of the project and other unique characteristics are assessed. The Company possesses extensive experience in handling projects with varying levels of complexity and specific requirements, such as high-security prisons, data centers, hospitals and medical facilities, and LEED-certified buildings. These projects typically encompass a full range of works, from piling and structural work to architectural, electrical, plumbing, sanitary, communication, computer, fire protection, ventilation, air conditioning, elevator, escalator, medical gas, building management systems, as well as interior decoration, furniture, and landscaping (both hardscape and softscape). This comprehensive expertise instills confidence in project owners when considering the Company for their projects.

Subsequently, the Construction Support and Project departments, in collaboration with the Bidding and Cost Planning sections, conduct technical and other relevant assessments before proposing blueprint extraction, quantity surveying, and pricing plans. Concurrently, the Bidding section, in conjunction with project representatives, summarizes the Terms of Reference (TOR), including construction duration, delivery methods, and payment terms. They also compile information on client credibility, financial standing, and other pertinent details. Once comprehensive information from both sides is available, management makes decisions regarding design, pricing, and bid submission. In terms of pricing, the Company adheres to a policy of meticulous cost estimation, encompassing direct construction costs based on bills of quantities, preparatory work expenses, and other associated costs. This ensures project execution in line with the Company's established standards. A profit margin, with a predetermined minimum rate approved by the Board of Directors, is added to cover operational expenses and maintain competitiveness.

During the proposal submission process, the Company utilizes tools and technology to enhance work efficiency, particularly BIM (Building Information Modeling) technology. BIM enables fast and accurate blueprint extraction, and the resulting data can be processed and utilized immediately in both the cost estimation and post-contract work phases, such as material take-off for budgeting and various engineering inspections. Additionally, for some large-scale projects, the Company employs BIM to create 3D models for presentation to clients. This aids in understanding, facilitates discussions on construction details and techniques, and can even highlight potential design conflicts to both designers and clients beforehand. Due to these diverse benefits, both public and private sector clients are increasingly recognizing the importance and value of utilizing BIM technology. Some projects even mandate its use as a standard practice and may award additional points for proposals incorporating BIM or demonstrating experience with it.

Upon being entrusted by clients as the construction contractor, the Company prioritizes project delivery that enables clients to utilize the completed work according to their intended purposes. This encompasses aspects of construction quality, accuracy, adherence to project scope, and meeting deadlines. Throughout the construction process, the Company leverages technology, knowledge, and its experienced team to continuously assess and address potential obstacles. On numerous occasions, this proactive approach has allowed the Company to present challenges along with proposed solutions or superior alternatives to clients, project supervisors, and internally, ensuring optimal outcomes for all parties involved. This commitment to client satisfaction fosters strong relationships and often leads to repeat business or referrals for future projects.

Customer and Employer Groups

The Company's customer and employer base can be categorized into three main groups:

(1) Government agencies. Government agency employers are subject to the Act on Procurement through the e-GP system, which involves bidding for projects. In the past, the Company has provided construction services to government agency clients such as the Department of Medical Services, Ministry of Public Health, Faculty of Medicine, Chulalongkorn University, Suranaree University of Technology, Navamindradhiraj University, the Courts of Justice, and the Department of Corrections. In the past, the types of construction work that the Company has been hired for by this customer group have been diverse, including hospitals, office buildings, and prisons.

(2) State enterprises and other state agencies. Employers in this group are established by government agencies but may have their own procurement systems. They announce construction bidding through their own channels. In the past, the Company has provided construction services to state enterprise and other state agency clients such as Chulalongkorn Hospital, the Thai Red Cross Society, the Institute for the Promotion of Teaching Science and Technology (IPST), and the Bank of Thailand. In the past, the types of construction work that the Company has been hired for by this customer group have mainly been hospitals and office buildings.

(3) Private sector. Private sector employers range from small limited companies to large public companies. The Company is contacted directly by clients or through project management consultants to submit bids. In the past, the Company has provided construction services to private sector clients such as Antnest Holdings (Thailand) Co., Ltd., Praram 9 Hospital Public Company Limited, Pruksa Holding Public Company Limited, and various foundations. The types of construction work received from this customer group are mainly hospitals and residential buildings.

Industry & Competition (Overall)

Recently, construction contractors, especially those who mainly undertake public sector projects, have faced challenges from delays in bidding for new projects. The disbursement of the budget is still slow, including rising construction costs.

The total value of the construction sector in Thailand is around 1.4 trillion baht per year. Of this, more than 57% is public sector construction and 43% is private sector construction.

Construction material prices, especially steel and cement, as well as labor costs, have risen. While the increase in the average price for bidding on government construction projects is still limited.

Delays in budget disbursement due to the government transition after the election. Delays in preparing and approving the annual expenditure budget, therefore, there must be a policy to adjust the investment plan.

The bank's loan disbursement for construction projects has strict consideration criteria.

Private sector, building construction, such as condominium construction, has more supply than demand. Residential projects are under pressure from the slow recovery of the residential market, including having to keep an eye on the oversupply of office space for rent, which may result in the cancellation of non-viable projects.

Construction process improvements, such as reducing construction waste and using construction technologies like Building Information Modeling (BIM), prefabricated construction technologies (Precast, Prefabrication, and Modular), and environmentally friendly machinery. In the future, it is also necessary to keep an eye on environmental regulations, which will be a condition for bidding on large construction projects, both public and private, more strictly.


Source: Construction Industry Analysis and Outlook SCB EIC, September 9, 2024.

Procurement of Products & Services

Reporting Mode

3116

Per-Business-Group Breakdown

ProcurementRaw Material AcquisitionProduction CapacityPurchase Proportion

The Company's product and service procurement process consists of 5 main steps:

(1) Bidding or Quotation

(2) Construction

(3) Procurement

(4) Work Delivery

(5) Warranty

The details can be summarized as follows:


Bidding or Quotation

The Company assigns the bidding department to follow up on news of bids and quotations in each channel according to the type of employer. The bidding department will follow up on projects of government agencies through the government procurement website, projects of private agencies through direct contact with private agencies or through recommendations from project consultants who have worked with the Company, and projects of state-owned enterprises through direct announcements of state-owned enterprises. When there is a target project that is interested in participating in the bidding and quotation process, the bidding department will study and understand the construction details and contract specifications, as well as assess the risks of the project to be bid on in various aspects, such as: (1) type of construction work and complexity of the work; (2) consideration of the reliability of the employer, both in terms of past project history and financial status; (3) reliability of the design company and the supervision company; (4) project duration and value; (5) project location in terms of travel and labor mobilization; and (6) competitors expected to participate in the bidding or quotation. The employer will be assessed to ensure that the employer is able to pay for the services.

When the Company decides to participate in a bid, the bidding department will be assigned to prepare a cost estimate for the bid price. The cost estimation for the bid price is an important process in the construction contracting business. Therefore, the Company has a team of experts for project drawing extraction for building structure works, architectural works, building system works, and electrical system works using BIM (Building Information Modeling) technology, which consists of Revit software for creating 3D building models and Navisworks software for extracting building structure drawings to be able to extract the quantity of materials used accurately and precisely, including material prices and labor costs that have been inquired from distributors or service providers by specifying the characteristics of the materials used to meet the needs of the employer. After that, the "quantity" and "price" information is used to prepare a cost estimate for the bid price and the accuracy of the information is checked every time before sending it to the authorized person to consider the cost estimate for the bid price. The Company has set a standard profit margin rate and authorization levels as guidelines for considering bids and quotations to ensure that the bidding and quotation process for each project is carried out as expected by the Company.

Construction

After being awarded a contract or being assigned a project by an employer, the Company will prepare a cost estimate for the construction work to be used to manage the project costs incurred during construction. The Company has a standard cost list of goods and services for use in estimating costs and considering the initial gross profit margin. Before construction, the Company will assign the construction support department to conduct a thorough survey of the construction site and surrounding areas to prepare a site layout plan (Site Layout) every time. The Company will also allocate personnel and machinery to the new project and install temporary utilities before the commencement of construction.

The Company designates the construction support department to be responsible for structural works, architectural works, building system works, and electrical system works, starting from the preparation of construction drawings (Shop Drawing: Shop DWG) and the construction schedule (Main Progress Schedule: MPS) to be used as guidelines for construction. The construction drawings (Shop DWG) must be approved by the Project Management Consultant (PMC) every time there is a change in the construction drawings to ensure that the construction is carried out correctly according to the drawings. In addition, the Company prepares a daily construction report (Daily Report), which reports the progress of the construction work performed each day to track the construction work according to the construction schedule (MPS) and complete it within the time frame specified in the contract. The Company also utilizes BIM (Building Information Modeling) technology using Revit software to create 3D building models to provide a clearer view of the building's dimensions. The Company also subcontracts some of the work to partners who have been working together for a long time and have a good relationship with each other according to the Company's procurement process, such as architectural work. The Company also hires labor from subsidiaries. After the construction of each stage is completed according to the contract, the Company will notify the Project Management Consultant (PMC) to inspect and accept the work in that installment. The Company will then proceed to collect the payment according to the actual installment incurred.

During construction, the actual costs incurred or the estimated costs in the cost estimate may change from the original estimate depending on the circumstances at that time. Therefore, the Company has a cost estimate control system to effectively and timely manage the gross profit margin of each project. The cost estimate of each project is reviewed every month. The management considers the estimated costs or work items that may have changed and revises them to be up-to-date, including proposing to the authorized person to approve the cost estimate and gross profit margin estimate again according to the authorization levels. This allows the Company to track and be aware of changes in costs and gross profit margins for each project in a timely manner in the event of changes in market prices of materials or changes in construction plans from the initial cost estimate and gross profit margin.

Work Delivery

Upon the final delivery of the work according to the contract, the Company will inspect the construction work and deliver the work to the Project Management Consultant (PMC) for inspection by submitting the work as Practical Completion. If the Project Management Consultant (PMC) inspects any defects or imperfections in the initial construction work and notifies the Company to make corrections before the final delivery (Final Completion), it is considered the completion of all work specified in the contract.

Warranty

The Company provides a warranty for the work after the building is delivered for a period of time depending on the agreement and type of employer. If the employer finds any defects or damage caused by construction within the warranty period, the employer can send a letter notifying the Company of the defects along with evidence. The Company will then contact the employer to inspect the defects/damage. If the defects/damage are caused by construction defects in the services provided by the Company, the Company will repair them or notify the subcontractor who performed the construction work in that work item to repair them at no additional cost to the employer. In addition, the Company has taken out construction insurance for the project, covering the construction period to the warranty period as specified in the contract.


In addition to the aforementioned processes, the Company also places importance on the management of skilled personnel. As the construction contracting business requires personnel with expertise in engineering and architecture to operate the business and supervise construction work, the number of skilled personnel in each field plays an important role in bidding, as the number of such personnel is part of the employer's criteria and requirements. As of December 31, 2024, the Company has 98 licensed engineers and 12 licensed architects.

Procurement

After receiving the work and signing the service contract with the employer, the company will prepare shop drawings (Shop DWG) and a master production schedule (MPS), which specifies the usage plan and quantity of construction materials, equipment, and labor, including the plan to hire subcontractors in each step. The procurement according to the drawings and construction plan consists of material procurement, labor hiring, and subcontracting. Upon reaching the scheduled date for ordering or hiring, the construction unit of each project will submit a price inquiry for material procurement, labor hiring, and subcontracting to the procurement department. This begins with the construction unit submitting a price inquiry request to the procurement department to use for inquiring prices from suppliers/service providers. The company has a process of inquiring prices from at least 3 suppliers/service providers to compare prices, proposals, and various conditions. This information is used to create a comparison table and serves as supporting data for considering and selecting the supplier/service provider that offers the most appropriate proposal and benefits the company. However, some procurements will be made through specific price inquiries. This is because certain construction materials or equipment cannot be compared due to having only one importer and distributor in Thailand, such as certain types of radiation equipment. Alternatively, the list of suppliers/service providers may be specified in the Terms of Reference (TOR) set by the employer. In such cases, price and qualification comparisons will be made for similar items to serve as guidelines for price negotiation.

After the procurement department selects the appropriate supplier/service provider, the company will prepare a construction budget for that particular scope of work. This allows the construction unit to prepare purchase requisitions (PR) / work requests (WR) according to the specified budget, which must be reviewed and approved by the project manager before being sent to the procurement department. The procurement department then prepares purchase orders (PO) / work orders (WO) for further consideration and approval by authorized personnel.

Furthermore, the company conducts quality assessments of suppliers/service providers every 6 months after the contract signing. These assessments cover delivery, quality, document accuracy, safety considerations, and after-sales service to ensure the quality of suppliers/service providers listed in the Approved Vendor List.

The construction business cannot determine production capacity. · Unit: Others · Spent: 0.0 · Total: 0.0 · Unit code: 2961 · Unit other name: Unit79431375.24 · Country code: 211 · Country name: Thailand · Raw material name: Line · 70792334.31 · Country code: 211 · Country name: Thailand · Raw material name: Concrete · 16050000.0 · Country code: 211 · Country name: Thailand · Raw material name: Machinery, equipment and construction (according to IPO purposes) · 14003141.5 · Country code: 211 · Country name: Thailand · Raw material name: Other building materials

Projects Under Construction

Has Projects Under Construction (Y/N)

Yes

Description

The Company also has projects under construction and not yet delivered as of December 31, 2023, as follows:

Total Projects

6

Total Project Value

3033650000.0

Recognized Value

890800000.0

Remaining / Unrecognized Value

2142850000.0

Projects

Project NameValueIncome %Est. YearsEst. MonthsEst. Completion
Building Construction Project Accident and Emergency Rajavithi Hospital82959.98432025-11-01
Building Project Head Office and Computer Center (Additional Section)80062025-07-01
Office Building Construction Project for the Institute for the Promotion of Teaching Science and Technology, including auxiliary structures75914.71302026-12-01
Construction Project S Ladprao 84 Hospital43157.03142025-04-01
Construction Project Multipurpose Courtyard King Chulalongkorn Memorial Hospital16519.49122025-10-01
Construction Project Oncology and Radiology Center Suranaree Subdistrict Mueang Nakhon Ratchasima District Nakhon Ratchasima Province8380.34272027-08-01

Debentures & Bills of Exchange

Has Debentures (Y/N)

No

Convertible Securities

Has Convertible Securities (Y/N)

No

Contents