Risk Management · 2025
In this section3 topics
Risk Management Policy & Plan
Policy & Plan Description
Risk is an uncertain event that has a chance of occurring, and if it does, it will cause damage or impact the company's operations, preventing it from achieving its objectives or set goals. Risk management is considered a part
of good corporate governance. Therefore, the company has established its risk management policy to control risks
to an acceptable level.
NL Development Public Company Limited and its subsidiaries ("the Company") are committed to good
corporate governance by adopting the principles of Enterprise Risk Management (ERM) in accordance with the COSO
risk management framework:
The Committee of Sponsoring Organization of the Treadway Commission, which is an internationally recognized standard for risk management, is adopted as the company's risk management guideline. The Board of Directors, executives, and employees at all levels must apply it appropriately and be aware of their responsibility to comply
with the risk management policy to ensure the utmost success and efficiency of risk management.
Risk Management Policy
The company recognizes the importance of organizational risk management, which will enable it to achieve its objectives and goals, maintain good corporate governance, and ensure stable and sustainable growth. Therefore,
the company has established a management policy risks, to be used as guidelines and a framework for operations across all company units, as follows:
1. The risk management plan is part of the strategic plan, which defines operational guidelines and
decision making for critical matters of the company.
2. The Risk Management Committee must establish a risk management framework and guidelines that meet
international standards.
3. Risk management shall be considered a crucial activity that all departments must adhere to.
4. To respond to risk management measures, the company is ready to support all departments in mobilizing
resources or existing resources to implement the risk management plan.
Roles, Duties, and Responsibilities in Risk Management
Risk management is considered the duty of all company personnel at every level, including advisors, representatives, or those who have received assigned to act on behalf of the company, with the following roles and responsibilities:
Board of Directors
Has direct responsibility for overseeing risk management, setting objectives, and defining acceptable risk levels.
(Risk Appetite) to avoid impacts on business operations and ensure consistent risk management across the organization.
understand risks that may have severe impacts on the company and must ensure that the company has implemented management actions appropriate potential risks.
Monitor the development of risk management approaches and frameworks.
Monitor and evaluate the risk management process.
Consider and approve the risk management framework and plan.
Audit Committee
Review for effective and efficient risk management systems.
Independently monitor risk management to ensure that the company has internal controls to appropriately manage risks throughout the company.
Risk Management Committee
Define and review the risk management framework, risk management charter, policies, and management processes, as well as recommend various risk management approaches related to the company's business operations to the management appropriately and effectively, in line with operational strategic directions,
business plans, and changing circumstances.
Support and develop risk management at all organizational levels, including promoting the development
of a risk management culture within the organization, defining the structure and responsibilities for risk management, and considering and approving policies, strategies, risk management frameworks, and
risk management plan, as well as review the Risk Profile and monitor organizational risk management.
Oversee, monitor, and review the plans and activities of various departments within the company,
and consider risk management reports and provide recommendations to ensure that risk management
is efficient and appropriate, consistent with policies Risk Management
Report risk management results to the Board of Directors for acknowledgment.
Review and assess the adequacy and appropriateness of the charter annually, and provide recommendations
to the Board of Directors for further consideration and approval.
Risk Management Working Group
Study and understand the charter, policies, and recommendations received from the Risk Management
Committee to develop a system Integrated Organizational Risk Management
Analyze and assess organizational risks affecting the company's objectives, goals, and success, and propose
them to the Risk Management Committee.
Reasonably consider the adequacy of risk management measures and internal controls to ensure successful operations according to the defined objectives, and manage remaining risks to determine methods for
controlling, preventing, or reducing the risks of organization, to ensure operational confidence, reduce potential errors, or, if they occur, keep them at an acceptable level.
Monitor operational risk management results with clear action plans, ensuring all plan objectives are fully achieved Severity level criteria are defined for each risk factor, expected severity level targets are set,
and reports can be generated the severity level of each factor quarterly. Risk Appetite and Risk Tolerance are defined for all risk factors, including having Integrated Risk Factor Management
Prepare and review the annual risk management plan, review the company's risk management manual to
prepare performance reports manage risks, propose to the Risk Management Committee.
Support continuous development of risk management systems and internal control systems, as well as
support communication channels within the organization for disseminating policies, regulations, orders, and operational manuals, as well as various news related to management risks thoroughly across the organization.
Senior Management
Monitor significant risks across the company and ensure that the company has appropriate risk management
plans.
Promote and support compliance with the risk management policy through appropriate risk management processes with the situation.
Supervisors and Employees
Identify and report risks related to operational activities to the supervisor.
Jointly develop risk management plans and implement them.
Internal Auditor
Communicate and coordinate with the Risk Management Committee to use information for planning risk-based auditing.
Review the performance of the Risk Management working group.
Ensure that the company has appropriate internal controls. Risk management and control are implemented in accordance with the company's policies and guidelines.
Risk Management Process
The company conducts risk management according to the 8 standards and components defined by COSO,
which cover Risk Management Approach The company has therefore defined the risk management process,
consisting of 5 steps as follows:
1. Objective Setting
In the operations of all departments, including operational personnel, business objectives or work objectives should be clearly defined consistent with policies, objectives, strategies, and acceptable risks.
2. Event Identification
Responsible units, including operational personnel, shall understand risks, risk factors, and identify potential events, which may be events that are both beneficial and detrimental to achieving objectives.
3. Risk Assessment
Responsible units, including operational personnel, shall assess risks in two dimensions: the likelihood of
an event occurring (Likelihood) and Severity of Impact from Events (Impact)
4. Risk Response
Responsible units, including operational personnel, shall consider effective and efficient risk management methods, taking into account acceptable risks, costs incurred versus benefits received. Risk response may involve
one or several methods combined, to reduce the likelihood of an event occurring and the severity of its impact,
which are:
Avoidance (Avoid)
Sharing or Transferring (Share / Transfer)
Reduction (Reduce)
Acceptance (Risk Acceptance)
Control Activities
Responsible units, including operational personnel, shall consider risk management or control activities,
which are policies and operational processes implemented to ensure that the company manages risks in
accordance with its internal environment, business characteristics, structure, and organizational culture,
which may vary.
5. Monitoring and Evaluation
Responsible units, including operational personnel, shall arrange for monitoring and reviewing risk management results and report to their supervisors to ensure that risk management is appropriately applied at all levels of the company, and that significant impact risks towards achieving the company's objectives, are reported to those responsible.
When the environment changes, established risk management methods may become inappropriate,
and control activities may be effective reduced, or operational goals may change. Therefore, it is necessary to
monitor whether risk management at each step remains effective. For organizational monitoring, the principle of
self assessment will be used, with the main departments responsible for managing any risk, that department will be responsible for evaluating its own risk management effectiveness, or it may be evaluated by organizational risk management working group. It shall be considered that the risk and opportunity assessment register according to
other standard systems and/or a corruption risk register that the company has prepared as part of its risk
management plan, which requires monitoring and evaluation such risks as well.
Risk management covers all aspects of risk, including strategic and business operations, management,
and operations, financial aspects, regulatory and legal compliance, good corporate governance, and corruption
human rights, sustainability, safety, occupational health, and working environment, as well as emerging risks.
The Board of Directors assigns the Chairman of the Risk Management Committee and the Risk Management Committee is primarily responsible for risk management and can appoint a risk management working group to
monitor and report results to Risk Management Committee and Board of Directors.
In addition, the company has appointed a Safety Committee in the workplace, which comprises executives
and employees, across head office areas, factory areas, and construction project areas with the number of
employees as stipulated by law to perform the duties of the Safety Committee according to law, and report
operational results and issues requiring development and improvement regarding safety, occupational health,
and working environment to the company's management team, and also includes the election of a welfare
committee in the workplace, acting as employee representatives to gather and offer opinions, suggestions, and hold meetings with the management team to develop and improve human resource management and development approaches, and welfare, which will lead to various policies to foster engagement and incentives to retain high- potential employees, enhancing the quality of life for employees to collaboratively drive the organization forward.
Risks to the Company's Business Operations
Risk Register
| Risk Name | Risk Characteristics | Consequences | Management Measures | Related Risk Factors |
|---|---|---|---|---|
| Risk from economic and political volatility | Volatile economic conditions and current uncertain domestic political policies may impact national administration and development investments, particularly as government budget disbursements remain slow. | Should the domestic economy or political policies experience volatility, this may adversely affect the country's infrastructure and utility investment plans, leading to a reduction. Consequently, the company's construction backlog may also decrease. This is attributable to a reduction in government bidding projects, which in turn intensifies competition among private sector entities for project bids. Furthermore, the government's policy to increase wages will result in elevated operational costs for the company. | The Company endeavors to mitigate volatility arising from potential risks in such cases by implementing a policy to set an appropriate and sufficient construction backlog to recognize revenue each year. Furthermore, the Company has various measures to reduce the impact of wage increases, such as optimizing construction management systems to enhance labor efficiency through the utilization of tools and machinery to replace labor or by upskilling the workforce, and by strictly controlling expenses. | 728 · Description: Volatility in the industry in which the company operates · Info category: STRATEGIC_RISK · 730 · Description: Government policy · Info category: STRATEGIC_RISK · 1715 · Description: Economic risk · Info category: STRATEGIC_RISK |
| Risk from fluctuations in construction material prices | Given that construction service contracts will have the contract value or service fees determined from the date of quotation and contract signing, the Company must control and manage such costs to remain within the estimated costs that have been set. The costs in construction projects primarily consist of construction materials such as rebar, structural steel, and cement, representing 20.00 – 30.00 percent of the total cost. | Most construction projects have a duration of 1 - 3 years. Therefore, the price of construction materials may deviate from the original estimates anticipated during construction, influenced by fluctuations in global material prices. Should material prices increase, it would inevitably lead to higher construction costs for each project, thereby directly impacting the company's operations. Consequently, the company may be exposed to risks arising from changes in construction material prices. | The Company is aware of such risks and has implemented risk management measures from the pre-bidding stage. This involves studying specifications, inspecting construction sites, inquiring about and forecasting trends in material and equipment prices. The Company also plans and determines appropriate construction techniques in line with specifications, construction sites, and contractual construction periods. This information is used to prepare cost estimates and determine operational expenses, resulting in the most reasonable construction cost estimate at that time. During construction, the Company continuously monitors the prices of construction materials. Should prices show an upward trend, the Company will consider placing orders or locking in prices with suppliers in advance to control potential cost fluctuations within an acceptable range, based solely on the quantities required for the construction plan. These materials will be stored at the Company's rebar storage facility in Phutthamonthon Sai 7, Sam Phran District, Nakhon Pathom Province, which has a capacity of over 5,000 tons of rebar. Furthermore, for the engagement of subcontractors for specific tasks or specialized contractors, the Company will negotiate and enter into service agreements to fix the service prices for those periods. Such subcontractors are required to provide contractual guarantees as security for fulfilling their obligations as specified in the contract. Additionally, for government clients, contract price adjustment clauses are stipulated based on the K Factor formula, which is an index for measuring changes in construction material prices. This references the construction material price index from the Ministry of Commerce, which calculates the K Factor by comparing the initial construction material index in the month of bid opening with the construction material index in the month of work submission. If the difference exceeds 4%, K Factor compensation can be claimed to offset the project's contract value in cases where construction material costs significantly increase. | 728 · Description: Volatility in the industry in which the company operates · Info category: STRATEGIC_RISK · 740 · Description: Shortage or fluctuation in pricing of raw materials or productive resources · Info category: OPERATIONAL_RISK · 733 · Description: Business operations of partners in the supply chain · Info category: STRATEGIC_RISK |
| Risk from inaccurate cost estimation | In deciding whether to participate in bidding or agree to provide construction contracting services, the Company will conduct studies and analyses of various project risks, and will perform quantity surveying and prepare project cost estimates, which comprise (1) Quantity and (2) Estimated Price. This is done to determine the expected operating profit margin before entering the bid. Upon completion of the cost estimates, they will be submitted to the management for consideration and decision regarding participation in the bidding. | Estimated costs and actual costs incurred during construction may differ due to discrepancies between estimated material quantities and actual material usage, adjustments to construction techniques, changes in scope of work from the client, fluctuations in construction material prices, or other unforeseen factors. Such discrepancies may cause project performance to deviate from the Company's expectations. Consequently, the Company faces risks from inaccurate cost estimation. If the estimation is too high, it may lead the Company to submit a bid price higher than other bidders or proposers, resulting in a loss of competitive opportunity. Conversely, if the estimation is too low, it may result in the Company's performance not meeting expectations, potentially leading to losses in that particular project. | The Company recognizes the importance of cost estimation, starting from the process of preparing construction cost estimates for bid consideration or agreeing to provide construction contracting services. A cost estimation manual has been developed to serve as a systematic guideline, and BIM (Building Information Modeling) technology is utilized to support construction quantity take-offs for increased accuracy. Furthermore, the Company has established a cost estimate review policy to guide the review and adjustment of cost estimates during construction. During construction, there may be changes in scope from the client that affect the projected cost estimates. The Company will assess the reasonableness and reliability of information received from the client's representatives and monitor the details of additions/reductions in scope until sufficient information is obtained before adjusting the cost estimates. If such costs involve subcontractors, the Company will negotiate increases and decreases in work value and prepare an addendum to the contract with the subcontractors. The Company has also mandated a monthly cost estimate review meeting, which includes both incurred and un-incurred costs, to review project cost estimates. Attendees from relevant departments participate to discuss and review the cost estimates for each project, identify reasons for changes in cost estimates, and assess the appropriateness of project forecasts. Should changes in construction prices or quantities be identified, cost estimates will be revised to ensure efficient and up-to-date management of costs and projected gross profits. Additionally, the Company has established a policy for evaluating the variance between the accounting progress rate (%Accounting) and the engineering progress rate (%Engineering), setting an acceptable variance threshold. If the variance between the accounting progress rate (%Accounting) and the engineering progress rate (%Engineering) exceeds the acceptable threshold, the Company will identify the causes of the discrepancy. This serves as a guideline for assessing the appropriateness of cost estimates in alignment with actual work values, thereby mitigating the risk of inaccurate cost estimates that could impact future operational performance. | 737 · Other name: Strategic and Business Operational Risks · Description: Other · Info category: STRATEGIC_RISK |
| Risk from Climate Change | Climate change is a global issue that organizations are increasingly prioritizing, as it is a significant problem with widespread impacts on business operations and human well-being. Governments are also issuing more regulations to control operations, especially if management is lacking. The risks from climate change do not merely refer to "global warming" but rather to extreme weather events that are increasing in frequency and intensity, such as droughts, heatwaves, and greenhouse gases. Furthermore, climate change is not just an environmental problem but a "physical risk" that directly affects construction companies. Thailand is currently facing more severe droughts and heatwaves, which impact costs, materials, and employee health. | Significant climate change impacts business operational capabilities and may cause disruptions to critical processes, thus posing a challenge for businesses to continuously achieve their objectives. Specifically, the impact of raw water scarcity for mortar mixing, concrete curing, and dust suppression leads to project delays and soaring water costs. This causes the evaporation rate of water in concrete to be excessively fast, affecting compressive strength and structural quality. Furthermore, it increases the risk of heatstroke among workers. | The company has developed a Business Continuity Plan (BCP), a risk management plan, and implemented operations in accordance with the Environmental, Social, and Governance (ESG) framework. It has also prepared greenhouse gas emission reports for its head office, Phutthamonthon Sai 7 factory, and all projects under construction each year to ascertain the organization's greenhouse gas emission volume and to seek further approaches to reduce greenhouse gas emissions. This is achieved through projects such as utilizing solar energy as an alternative, reforestation, and using low-carbon construction materials, among others. Furthermore, the company operates in accordance with environmental management standards ISO 14001 and ISO 45001, as well as occupational health, safety, and working environment management. | 1717 · Description: ESG risk · Info category: STRATEGIC_RISK · 1719 · Description: Climate change and disasters · Info category: STRATEGIC_RISK |
| Risk of personnel shortage | The construction contracting business is a business that relies on the knowledge, expertise, and experience of personnel, from the executive level to engineering staff and specialists in various fields. It can therefore be stated that personnel are a key factor in the company's success. Consequently, the competitiveness of the company is dependent on the aforementioned personnel who work with the company, which results in the company facing a risk of over-reliance on competent executives and employees. | If the Company is unable to retain its executives and/or engineering staff and/or any specific experts, and cannot recruit suitable or comparably qualified replacements, this may impact ongoing projects and competitiveness. This could, in turn, affect the Company's operations and business opportunities. As of December 31, 2025, the Company has 108 engineering personnel holding professional engineering licenses and 12 architectural personnel. | The company recognizes the risk of personnel shortages and has therefore developed human resource management, starting from an effective selection system to acquire personnel who meet the objectives. The establishment of fair salary rates and various benefits based on ability and work performance serves as an incentive for work. Furthermore, the company promotes the development of personnel's knowledge and skills by organizing appropriate training courses for its employees. Moreover, the company provides opportunities for capable personnel to be promoted to senior management positions to foster career advancement. The company has established a Succession Plan policy for positions at the Managing Director level and various management levels. When a position becomes vacant or the incumbent is unable to perform their duties, the company will propose selected and evaluated successors to perform the duties or fill the vacant position, when considering the turnover rate of engineering and architectural personnel who hold professional licenses. which are key personnel, in 2023 – 2025, representing a proportion of 17.53%, 14.48%, and 22.88% respectively. However, the company has recruited additional personnel in this group to replace those who left, with an increase of 33, 27, and 31 personnel in 2023 – 2025, respectively. | 738 · Description: Reliance on employees in key positions · Info category: OPERATIONAL_RISK · 739 · Description: Shortage or reliance on skilled workers · Info category: OPERATIONAL_RISK |
| Risks from engaging subcontractors | Due to construction work requiring specialized expertise, particularly in the installation of systems and various equipment for each project, such as earth retention systems, pile drilling, and elevator installation. Furthermore, the significant number of laborers required leads the company to engage subcontractors to meet the client's requirements and ensure timely project delivery as stipulated in the contract. | The engagement of subcontractors may result in operational errors or non-compliance with contractual obligations by the subcontractors. This could lead to damage to the project construction plan, potentially causing it to be halted or delayed, and consequently affecting the company's operational performance. | The Company mitigates such risks by establishing a subcontractor evaluation process that considers preliminary information such as registered capital, maximum project value previously undertaken, etc. For projects requiring specialized subcontractors, such as building assembly, electrical and communication works, and mechanical partner works, etc., additional job-specific qualifications will be considered, such as technical aspects and personnel capabilities, etc. This is to ensure their competence and quality of work performance as specified by the client, thereby reducing the likelihood of damage, errors in work, or non-compliance with subcontractor agreements. Subsequently, these subcontractors are registered in the Approved Vendor List. The Approved Vendor List is reviewed and evaluated every 6 months, considering the quality of work and performance supervision, understanding of scope of work and coordination, operational control and safety, and trustworthiness. Furthermore, the subcontract agreements stipulate a security deposit ranging from 5.00% to 10.00% of the subcontract value. Should a subcontractor fail to comply with the contract during both the construction period and the warranty period, the Company is entitled to seize the aforementioned security deposit, in accordance with the agreed-upon contract. In the past, the Company encountered an incident where a subcontractor failed to perform work as agreed. The Company therefore enforced the contractual terms by notifying the subcontractor in writing of the specified non-compliance and the intention to seize the security deposit. The Company then proceeded to procure a new subcontractor to provide services during the same period. The Company has not previously experienced such subcontractor issues that would lead to the disruption or delay of project construction plans, thereby impacting the Company's operational performance. | 739 · Description: Shortage or reliance on skilled workers · Info category: OPERATIONAL_RISK |
| Risk of project delivery delays | In operating the construction contracting business, the Company is responsible for carrying out construction in accordance with the requirements and specifications of the client for each project, and must deliver the work within the timeframe stipulated in the contract. However, during construction, the Company may encounter external factors that could impact the Main Progress Schedule (MPS), leading to delays. These external factors, which are beyond the Company's control, include: (1) delayed handover of the construction site by the client, (2) changes (additions/reductions) to the scope of work by the client, (3) changes in laws and government policies related to business operations, and (4) impacts from unforeseen events such as epidemics, emerging diseases, natural disasters, as well as delays in work delivery due to non-compliance with specified standards. Consequently, the Company may face the risk of not being able to deliver the work as stipulated in the contract. | In the event that the company is unable to deliver the work as stipulated in the contract, this will impact the company's resource management and liquidity. Furthermore, the company may be subject to penalties incurred due to late delivery of work beyond the specified timeframe. | The Company has established operational procedures before deciding to undertake a project, by thoroughly studying and understanding the nature of the project, the construction specifications, and the draft contract from the client. It also analyzes specific risks in each project that may affect the construction period, to inform the appropriate decision to undertake the project. Furthermore, during construction, the Company requires the Project Quality Management Department to prepare status reports for the work plan of all projects to monitor weekly and monthly construction status, evaluating the construction plan against the contractually stipulated timeframe or issues requiring rectification, and present them to the Company's management regularly and continuously. Should any project's work be significantly behind schedule or if there are events that may cause construction delays affecting the project delivery timeline, the Project Quality Management Department will inform the executives and project managers concerned of such issues. They will then discuss with the client and project consultants to deliberate on the causes and courses of action for events that deviate from the planned schedule, or issue a letter reserving the right to extend the project delivery period to formally explain the reasons to the client in writing. Historically, the Company has never been required to pay penalties for late project delivery. | 741 · Description: Systems or internal control system · Info category: OPERATIONAL_RISK · 746 · Description: Delays in the development of future projects · Info category: OPERATIONAL_RISK |
| Risk of errors in construction contracting services | During construction, accidents or operational errors by the company can always occur, affecting both construction workers, assets used for construction, and third parties, as well as damage to property during the construction period. Furthermore, after project handover, the company is obligated to guarantee the work for a period of 1 – 2 years, a duty that requires the company to perform repairs and be responsible for claims for damages resulting from errors in construction contracting. | Consequently, the company faces risks arising from accidents or errors that could impact its operations, including its reputation, potential lawsuits, legal proceedings, and increased expenses. | To ensure construction efficiency and minimize errors arising from construction contracting, the Company requires its construction units to primarily adopt the quality policy in accordance with ISO 9001 standards for their operations. Additionally, the environmental management system ISO 14001 and the occupational health and safety management system ISO 45001 will be implemented in 2025, and strict adherence to standards for the administration and management of safety, occupational health, and working environment related to construction work will be enforced. This includes appointing both Safety Officers (SO) and Safety, Occupational Health, and Environment Committees (SHEC) for each construction unit to manage potential safety risks, requires risk assessment and the preparation of plans or measures to prevent and manage safety risks, including environmental impacts and sustainability issues in all dimensions, involving all stakeholders from before the start of the project until the completion of handover for all current and future construction projects, as well as providing protective equipment for workers to wear during construction operations to reduce accidents. Furthermore, project managers, project engineers, site supervisors, and internal project personnel with relevant experience and capabilities are selected and appointed, and regular training is provided to personnel in both engineering and safety. In addition, the Company procures Contractor All Risks Insurance (CAR) for each project, which covers contractual liabilities such as construction work, civil engineering work, and machinery installation. It also covers legal liabilities under the contract that may arise towards third parties. | 741 · Description: Systems or internal control system · Info category: OPERATIONAL_RISK · 746 · Description: Delays in the development of future projects · Info category: OPERATIONAL_RISK · 736 · Description: Damage to company image and reputation · Info category: STRATEGIC_RISK · 749 · Description: Safety, occupational health, and working environment · Info category: OPERATIONAL_RISK |
| Risk of income inconsistency | The revenue recognized by the company will primarily be during the construction period until the contractual delivery of work. Therefore, to maintain or increase the company's revenue level consistently, the company must continuously participate in bidding or submit proposals to secure new engagements. | The continuity of participating in bids or submitting proposals depends on the number of projects that clients open for bidding or proposals. There may be significant external factors affecting project expansion or new investments by both public and private sector clients, such as economic conditions, politics, and the plans and progress of public and private sector project investments. In the past year 2568 (2025), Thailand experienced an economic slowdown due to decreased consumption and public sector investment, coupled with a contraction in private sector investment, as well as the competitive landscape of the construction contracting industry, which has become more competitive due to a large number of construction contractors in the industry. These factors may lead to a lack of projects open for bidding or proposals, and there may be more bidders or proposers offering alternatives to clients, which could result in the Company not being awarded contracts for the planned number of projects and a risk of inconsistent revenue year after year. | The Company recognizes the risk that its revenue may not be consistent, which stems from the slowdown in project expansion plans or investments by both public and private sectors, as well as from increased competition in the aforementioned industry. Therefore, the Company has assigned its bidding department to regularly monitor news regarding job proposals and tenders through key channels such as the Electronic Government Procurement (e-GP) system, websites of state enterprises and private sector procurement departments, and through recommendations from design consultants or construction supervisors, among others. This also includes participating in bids for projects involving a variety of building types, combining both new building construction and renovation works. | 1725 · Description: Income volatility · Info category: FINANCIAL_RISK |
| Risk of delayed payment and payment default by the employer | To claim payment from the client, the Company must complete construction in accordance with the client's requirements for each installment specified in the contract and must first pass the work inspection process by the client. Only then can payment be claimed from the client. Therefore, during construction, the Company must bear various construction costs, including labor and material costs. This exposes the Company to risks of delayed payments and defaults by the client, particularly if the client experiences financial difficulties and is unable to make payments as per the contract terms. | Delayed payments and payment defaults by clients may cause damage to the working capital liquidity for business operations and the company's performance in the short and long term. In the past, the company had two projects where clients defaulted on service payments, which occurred since 2014. | Therefore, the Company places importance on the work acceptance consideration process by always analyzing the client's background, financial status, credibility, and business operations before accepting work. This also includes specifying advance payment terms from the client before commencing work under the contract. Furthermore, during construction operations, the Company requires the Accounting and Finance Department to regularly monitor service payments for each work installment according to the schedule stipulated in the contract. In the event that a client's payment is overdue beyond the specified period, the Accounting and Finance Department will escalate the matter to the Company's executives and project managers for assistance in following up with the client. Currently, the Company has no clients with overdue service payments or risks of late payment and default by clients. | 763 · Description: Default on payment or exchange of goods · Info category: FINANCIAL_RISK |
| Risk of inability to bill and collect unbilled revenue | Unbilled revenue results from the company completing construction prior to the billing cycle. Consequently, the company has recognized revenue from the construction operations but has not yet been able to issue an invoice for the construction work. This is a typical characteristic of the construction contracting business. | If the company proceeds with construction significantly ahead of the scheduled progress payments, it may incur construction costs arising from material expenses, labor costs, and subcontractor fees. Furthermore, delays in invoicing for unbilled revenue, caused by late work acceptance or amendments to contractual documents, could adversely affect the company's working capital and liquidity. | The Company has appropriate construction planning, which aligns with the work schedule specified by the client. Furthermore, the Company has assigned its legal department to monitor amendments to contract addendums and the client's work acceptance plan to enable the Company to invoice and collect outstanding revenue. Additionally, the Company has a policy of engaging subcontractors on a back-to-back basis, whereby services are paid to subcontractors only after the Company has received payment from the client. This reduces the risk of bearing construction costs if the Company is unable to invoice and collect service fees. Currently, the Company faces no liquidity management risks. | 767 · Other name: Financial Risk · Description: Other · Info category: FINANCIAL_RISK |
| Risk from changes in regulations and laws | In conducting its construction contracting business, the Company must comply with regulations, rules, and laws as stipulated by ministerial regulations and rules set by relevant government and private sector agencies. This particularly applies to personnel responsible for construction or supporting construction, who must possess essential professional licenses, such as a controlled engineering professional license and an architectural professional license, among others. This also includes other licenses related to occupational safety operations. Furthermore, the Company is obligated to comply with all applicable laws, including any municipal ordinances as prescribed by each locality. These various personnel licenses have a specified duration and require periodic renewal. There may also be amendments to laws and/or regulations related to such licenses, which could necessitate the Company undertaking additional actions. | Therefore, the Company cannot guarantee that it will be granted renewal or that there will be no delays in renewal, nor can it guarantee that it will be able to immediately comply with any new laws or regulations that may be enacted, which could impact the Company's business operations and performance in the future. | The Company establishes controls and oversight to ensure that its operations comply with the supervision of relevant ministries and agencies, as well as any other laws related to the Company's business operations. The Company will also proceed to renew licenses whenever due or notify personnel responsible for key functions to periodically renew their professional licenses. Furthermore, the Company mandates its legal administration unit to monitor changes in relevant laws and regulations affecting the Company's business, including labor protection, various rules and regulations, and newly issued regulations. This is to enable the Company to promptly plan its business operations and contingency plans for such changes, and to ensure that the business can continue without interruption. | 756 · Description: Change in laws and regulations · Info category: COMPLIANCE_RISK · 757 · Description: Laws and regulations is not favorable for doing business · Info category: COMPLIANCE_RISK · 758 · Description: Violations of laws and regulations · Info category: COMPLIANCE_RISK |
| Emerging Risks | Emerging risks are losses arising from risks that have not yet manifested but may occur in the future due to changing environmental conditions. This type of risk emerges slowly, is difficult to identify, has a low frequency of occurrence, but when it does occur, it has severe impacts. Emerging risks are often identified through predictions based on studies of existing evidence. These risks typically result from political, legal, social, technological, physical environmental, or natural changes. Sometimes, the impacts of this type of risk may not be identifiable in the present. Examples include problems arising from nanotechnology, climate change, or the outbreak of epidemics. Construction robotics and AI in project management (currently, these technologies are still expensive and not yet widely adopted in Thailand, but they are developing rapidly, and it is not yet clear which technology will become the main standard (Standard Adoption) in the next 5-10 years). Climate change is a slow process, but once laws are actually enforced (e.g., carbon taxes on construction materials like cement and steel), costs will skyrocket immediately. | If competitors can utilize innovation to reduce costs and timelines by 30-50%, while NL continues to rely on manual labor and traditional methods, the company could face a severe loss of competitiveness, potentially leading to disruption from the market. Higher costs and reduced opportunities to bid for projects without specialized expertise. | Control (Reduction) and Avoidance are closely monitored. The company supports the acquisition of knowledge and the development of personnel skills to possess expertise related to technologies used in construction processes, and promotes the creation of various innovations to be utilized in the business. This is to respond to cost reduction, enable the use of technology to mitigate risks, and enhance competitive potential. Information regarding laws and regulations to be enforced, stemming from climate change issues, is monitored and studied to establish guidelines and practices in compliance with such laws or regulations, as well as to develop or recruit personnel with specialized expertise. | 732 · Description: Changes in technologies · Info category: STRATEGIC_RISK · 1719 · Description: Climate change and disasters · Info category: STRATEGIC_RISK |
Risks to Securities Holders' Investment
Risk Register
| Risk Name | Risk Characteristics | Consequences | Management Measures | Related Risk Factors |
|---|---|---|---|---|
| Risk from reliance on key executives | The Company has been engaged in the construction contracting business for over 40 years, experiencing continuous growth under the management of the Rojanlertjanya family group, which has passed down business management from generation to generation. Currently, the core management team comprises Mr. Saran Rojanlertjanya, President, and Mr. Chanin Rojanlertjanya, Vice President for Administration, both of whom play a crucial role in determining the Company's policies, direction, and core business operations. | Dependence on key executives may adversely affect business management should these executives become unable to perform their duties or oversee operations in the future. Furthermore, it could also impact the management's corporate image. | The Company recognizes such risks and therefore implements a decentralized management approach. This involves the President, Vice President, and various department directors with diverse experience and expertise, who collectively oversee different operational lines, thereby reducing the risk of over-reliance on a single executive. Furthermore, the Company has established a policy for a critical succession plan to ensure that it possesses personnel with the knowledge, capabilities, and potential ready to assume key positions within the organization, enabling the Company to operate and expand its business sustainably when such positions become vacant. | 769 · Other name: Risk from reliance on key executives · Description: Other · Info category: HOLDER_RISK |
| Investment Risk for Securities Holders | The company has major shareholders. Based on information as of May 7, 2025, the company's major shareholder group is the Rojlertjanya Group (this is merely a preliminary grouping based on surnames and the relationships of parents, children, and spouses of children). This group collectively holds 74.02 percent of the paid-up registered capital, which is a significant shareholding proportion. This gives them influence over determining management policies in a particular direction, as well as the ability to control resolutions at shareholder meetings that require a majority vote, such as the appointment of directors or requesting resolutions on other matters that rely on a majority vote of the shareholder meeting. | Other shareholders may face risks and be affected by the Rojlertjanya Group's ability to exercise its right to object to or disapprove resolutions at shareholder meetings on matters requiring at least three-fourths of the total votes of shareholders attending the meeting and entitled to vote, such as the company's articles of association and regulations. Alternatively, there may be a risk of being unable to gather sufficient dissenting votes to scrutinize and provide a check and balance on proposals put forth by major shareholders. | The Company recognizes the importance of checks and balances and has clearly and transparently defined the scope of authority and responsibilities for its various committees to build confidence among shareholders. The Company will disclose information and comply with the relevant criteria and regulations of the Securities and Exchange Commission (SEC) and the Stock Exchange of Thailand, thereby enabling shareholders to access important business information or consider investing in securities. | 769 · Other name: Investment Risk for Securities Holders · Description: Other · Info category: HOLDER_RISK |